For customer and builder
- Initial object and project analysis
- Preparation of the TERIVA ceiling plan
- Preparation of a commercial offer
- Order preparation and assembly
- Consulting on installation (by phone or on site as needed and available)
TERIVA ceiling – 4,0/1 |
Technical information |
|
Ceilings lengths, mm Ceilings height, mm Mass of 1 m2 per ceiling, kg Gross ceiling load per 1 m2, kg |
1800 ÷ 7200 mm 240 mm 270 kg 670 kg |
|
Application: in the construction of residential and non-residential buildings (usually as an intermediate ceiling) |
||
TERIVA LIGHT ceiling – 4,0/1 |
Technical information |
|
Ceilings lengths, mm Ceilings height, mm Mass of 1 m2 per ceiling, kg Gross ceiling load per 1 m2, kg |
1800 ÷ 7200 mm 240 mm 190 kg 670 kg |
|
Application: in the construction of residential and non-residential buildings (basement, an intermediate ceiling flat roof overlay) |
||
TERIVA LIGHT ceiling – 4,0/2 |
Technical information |
|
Ceilings lengths, mm Ceilings height, mm Mass of 1 m2 per ceiling, kg Gross ceiling load per 1 m2, kg |
1800 ÷ 8000 mm 300 mm 235 kg 715 kg |
|
Application: in the construction of residential and non-residential buildings (basement, an intermediate ceiling flat roof overlay) |
||
TERIVA LIGHT ceiling – 4,0/3 |
Technical information |
|
Ceilings lengths, mm Ceilings height, mm Mass of 1 m2 per ceiling, kg Gross ceiling load per 1 m2, kg |
1800 ÷ 8600 mm 340 mm 260 kg 740 kg |
|
Application: in the construction of residential and non-residential buildings (basement, an intermediate ceiling flat roof overlay) |
||
TERIVA LIGHT ceiling – 6,0 |
Technical information |
|
Ceilings lengths, mm Ceilings height, mm Mass of 1 m2 per ceiling, kg Gross ceiling load per 1 m2, kg |
1800 ÷ 7800 mm 340 mm 260 kg 1000 kg |
|
Application: in the construction of residential and non-residential buildings (basement, an intermediate ceiling where a higher load is required) |
||
TERIVA LIGHT ceiling – 8,0 |
Technical information |
|
Ceilings lengths, mm Ceilings height, mm Mass of 1 m2 per ceiling, kg Gross ceiling load per 1 m2, kg |
1800 ÷ 7200 mm 340 mm 260 kg 1200 kg |
|
Application: in the construction of residential and non-residential buildings (basement an intermediate ceiling where a higher load is required) |
- Assembly should be carried out as shown in a drawing (→↓). If there is no assembly direction indicated, then it should be started from doubled joist. If there is no double joists, assembly should be started from any load bearing wall that is parallel to joists..
- Joists should have at least 8-12 cm of support on top of a load bearing wall (depending from a length of a joist);
- End blocks or EPS blocks should be placed at the end of the joist.
- Use temporary supports. Temporary supports should be place at max 1.9m between them. Proper ground preparations should be made under temporary supports.
- Rest of the blocks should be assembled;
- Concrete ring beams (4Ø12, if not indicated differently) and load distribution beams (2Ø12), must be assembled;
- Joists, that are longer than 6,00m in length, has to have an additional L shaped 2Ø12 joist end reinforcement fixed to external side of concrete ring beam reinforcement ant top side of joist);
- To fully assemble TERIVA LIGHT (with EPS blocks), it has to have a 150×150 (Ø≥3,5) steel net through all area. It has to be raised no less than 1cm from blocks;
- Pour concrete (no less than C20/25, particle size 8/16, viscosity S3) all area (on top of joist, blocks, ring beams, load distribution beams, no less than 4cm thickness).
- While pouring concrete, it must be ensured, that concrete will not wall from high altitude. All concrete has to be spreader evenly throughout all area. Concrete has to be vibrated trough all is depth, to ensure that there would not be any air bubbles
- All relevant instructions must be followed while curing concrete.
- PTemporary supports can be removed when concrete reaches 80 of its desired strength. Usually, that strength is reached in 14 days, when ambient temperature is around +10° C. If ambient temperature is lower, concrete cures longer.
- TERIVA ceiling system should be assembled following given drawings and assembly instructions.
For current prices of TERIVA floor elements, please contact us by e-mail info@teriva.lt or by phone +37061005515
Contact us!
Office address
Panerių g. 51-311 (3 a),
LT-03160 Vilnius
Business hours
I-V 900 - 1730
VI-VII we are not working
Phones:
Mob. +370 610 05515